This presentation will examine the evolving role of prefabricated concrete products within the AEC industry, with a focus on engineering applications and performance. We’ll review recent innovations in manufacturing processes, productization, and standardization that are driving efficiency and consistency in precast systems. Sustainable design strategies and the environmental advantages of precast concrete will be discussed in the context of lifecycle performance and embodied carbon reduction. The session will also highlight our newly opened precast facility in Washington, designed to deliver efficient, safe, and sustainable production capabilities that support regional infrastructure needs. We’ll conclude with case studies from recent projects in the Pacific Northwest.

About Zak Perkerewicz

Zak Perkerewicz is a Preconstruction Manager for Knife River Prestress, Inc., which is the largest producer of precast concrete products in the Pacific Northwest.  Zak began his career in the precast/prestressed concrete industry in 1997 and has been with Knife River since 2001. Over the years, he has held a variety of roles spanning project management, operations, and preconstruction.  In his current role, Zak works closely with the AEC community to develop large-scale commercial and architectural projects throughout the region. Knife River Prestress is proud to be an “ABC Plant,” meaning it is certified to produce Architectural, Bridge, and Commercial precast concrete products. With the expanded capacity of two plants, our company is uniquely positioned to serve a wide range of project types and industry needs across the Pacific Northwest.

About Dan Serra

Dan earned his BS (2012) and MEng (2013) in Civil Engineering at Oregon State University and has been with Knife River Prestress since 2013. With over 12 years of experience, he has contributed to a wide range of precast and prestressed concrete projects, including bridges, data centers, stadiums, parking garages, and other commercial and infrastructure developments. His portfolio includes notable work on the Newberg-Dundee Bypass Bridges, the Providence Park Stadium Expansion, and the BMW of Tigard parking garage. Dan and his wife Kim welcomed twin daughters to the world in January 2025, bringing both joy and a new dynamic to their lives.