Special Inspection

The following Quality Assurance Guideline was prepared by SEAO for use on Project Drawings for compliance with the 2009 IBC as amended by the State of Oregon (2010 OSSC). The notes will proceed the tables on a typical set of drawings. The guidelines will Need to be customized for each project, both notes and tables. Cell areas, on the tables, with 'a' or 'b' are to be filled in. Delete items/tables not needed for a specific project. This document is not intended to be boiler plate. Supplement this documents with division one of the specifications as needed.